WP No |
Del No |
Del No |
Title |
Lead Beneficiary |
Nature |
Est. Del. Date (annex I) |
WP3 |
D3.6 |
D13 |
Final report |
NOA |
Report |
28 Feb 2019 |
WP4 |
D4.1 |
D14 |
WP4 1st activity report |
INAF |
Report |
31 Aug 2016 |
WP4 |
D4.2 |
D15 |
WP4 2nd activity report |
INAF |
Report |
31 Aug 2017 |
WP4 |
D4.3 |
D16 |
WP4 3rd activity report |
INAF |
Report |
31 Aug 2018 |
WP4 |
D4.4 |
D17 |
WP4 final activity report |
INAF |
Report |
28 Feb 2019 |
WP5 |
D5.1 |
D18 |
WP5 1st activity report |
ULEIC |
Report |
31 Aug 2016 |
WP5 |
D5.2 |
D19 |
WP5 2nd activity report |
ULEIC |
Report |
31 Aug 2017 |
WP5 |
D5.3 |
D20 |
WP5 3rd activity report |
ULEIC |
Report |
31 Aug 2018 |
WP5 |
D5.4 |
D21 |
WP5 Final report |
ULEIC |
Report |
28 Feb 2019 |
WP6 |
D6.1 |
D22 |
Design tradeoff report (X-ray sensors) |
SRON |
Report |
31 Aug 2016 |
WP6 |
D6.2 |
D24 |
Design tradeoff report (AC) |
INAF |
Report |
31 Aug 2016 |
WP6 |
D6.3 |
D23 |
Design tradeoff report: AC biased readout |
VTT |
Report |
31 Aug 2016 |
WP6 |
D6.4 |
D25 |
New set of SQUIDs for readout |
VTT |
Demonstrator |
31 Aug 2017 |
WP6 |
D6.5 |
D26 |
Developed H/W components: X-ray microcalorimeter detector |
SRON |
Demonstrator |
31 Aug 2018 |
WP6 |
D6.6 |
D27 |
Upgraded test facility for readout option |
SRON |
Other |
31 Aug 2018 |
WP6 |
D6.7 |
D28 |
Developed H/W components: AC detector |
UNIGE |
Demonstrator |
31 Aug 2018 |
WP6 |
D6.8 |
D29 |
Developed H/W components: interconnecting harness |
CEA |
Demonstrator |
31 Aug 2018 |
WP6 |
D6.9 |
D30 |
Developed H/W components: optical filters |
UNIPA |
Demonstrator |
28 Feb 2018 |
WP6 |
D6.10 |
D31 |
WP6 Final report |
SRON |
Report |
28 Feb 2019 |
WP7 |
D7.1 |
D32 |
X-IFU mass model |
INAF |
Report |
28 Feb 2017 |
WP8 |
D8.1 |
D35 |
Prototype Design and Performance Report |
ULEIC |
Report |
30 Jun 2016 |
WP8 |
D8.2 |
D36 |
Screening test facility final design report |
INAF |
Report |
30 Jun 2016 |
WP8 |
D8.3 |
D37 |
Design report on the collimated X-ray beam |
MPG |
Report |
30 Jun 2016 |
WP8 |
D8.4 |
D38 |
Optical design tradeoff report |
ULEIC |
Report |
31 Dec 2017 |
WP8 |
D8.5 |
D39 |
Report on the characterization of master high resolution XOU |
MPG |
Report |
31 Dec 2017 |
WP8 |
D8.6 |
D40 |
Screening facility technical assembly completion report |
INAF |
Report |
31 Dec 2017 |
WP8 |
D8.8 |
D42 |
Measurements vs theory report of the different X-ray optics units |
MPG |
Report |
31 Dec 2018 |
WP8 |
D8.9 |
D43 |
Report on software for optical design, theory and simulations |
ULEIC |
Report |
31 Dec 2018 |
WP8 |
D8.10 |
D44 |
X-ray test and performance verification report |
INAF |
Report |
31 Dec 2018 |
WP8 |
D8.11 |
D45 |
Performance verification report for the collimated X-ray beam |
MPG |
Report |
31 Dec 2018 |
WP9 |
D9.2 |
D47 |
Mission Requirements Document |
CNRS |
Report |
31 May 2016 |
WP9 |
D9.3 |
D48 |
Report on the selected mission design |
CNRS |
Report |
31 Aug 2016 |
WP9 |
D9.4 |
D49 |
Detailed performance Report |
CNRS |
Report |
31 Aug 2018 |
WP10 |
D10.2 |
D52 |
Survey report final |
TAS |
Report |
31 Jan 2019 |